After the contract is signed, the site must be inspected in more depth and detail. For various reasons, the construction may not be fully investigated during the lighting design, but the lighting project is about to be implemented before entering the site, and the preparatory work before entering the site must be completed in more depth and detail.

When the lighting project starts construction, the construction organization design should be done well. The construction team must be prepared and ready to enter the site. It is necessary to do the laying of pipelines first, while preparing for the production of lamps and control systems such as distribution boxes. After the pipeline is laid, the lamps and lanterns should enter the site. This is the most important task. Not only should the installation be paid attention to, but also the angle and position of the lamps and lanterns, so that the lighting effect can reach a satisfactory level. Pay attention to safety, especially the safety of spider-men working at heights. Safety cannot be overemphasized. In this process, we must pay attention to the construction period. The construction must be carried out in strict accordance with the time planned by the construction organization. No special circumstances must not delay the construction period. After the installation is complete, it is the debugging stage. After the commissioning is satisfied, the Lianghua Engineering Company shall first carry out internal inspection and acceptance, and then ask Party A for acceptance after passing the test. After passing the acceptance, we must cooperate with the company to complete the project acceptance procedures and urge the project progress payment, and then after-sales maintenance will be the content.